M12 Overmolded A, D, & X-Code Cable Assemblies

HARTING M12 Overmolded A, D, and X-Code Cable Assemblies offer an outer Push-Pull mechanism with a robust locking interface to reduce installation time and space/clearance needs. These cable assemblies feature a 60V DC voltage rating, 4A (0.5A X-Cod) current rating, and 3 to 8 contacts. The M12 overmolded cable assemblies are standardized according to IEC 61076-2-010 and are shock and vibration-proven according to IEC 61373. These cable assemblies are shielded and come with an IP65/67 protection rating. The M12 overmolded cable assemblies include Yellow/Green/Black cable jacket color and PVC/PUR/EtherRail cable jacket material. These cable assemblies are ideal for passenger information systems, communication, camera systems, and data transmission for industrial PCs, sensors, and actuator applications.

Results: 188
Select Image Part # Mfr. Description Datasheet Availability Pricing (JPY) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Gender Coding Cable Length Current Rating Voltage Rating Wire Gauge - AWG Jacket Color IP Rating
HARTING Sensor Cables / Actuator Cables M12 D-COD 4-POL AN/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥20,290.8
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- PUR P Non-Stocked Lead-Time 17 Weeks
¥11,514.1
¥9,569
Min.: 1
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- PUR P Non-Stocked Lead-Time 17 Weeks
¥12,369.5
¥10,537.4
Min.: 1
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- PUR P Non-Stocked Lead-Time 17 Weeks
¥12,934.2
¥11,019.1
Min.: 1
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- PUR P Non-Stocked Lead-Time 17 Weeks
¥16,390.7
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- RAIL Non-Stocked Lead-Time 26 Weeks
¥12,100.4
¥11,995.7
¥10,902.8
Min.: 1
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥12,947.5
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥23,632.7
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥28,454.6
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PVC Non-Stocked Lead-Time 17 Weeks
¥17,003.7
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PVC Non-Stocked Lead-Time 26 Weeks
¥19,724.4
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PVC Non-Stocked Lead-Time 24 Weeks
¥20,096.4
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PVC Non-Stocked Lead-Time 26 Weeks
¥23,913.4
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PUR Non-Stocked Lead-Time 17 Weeks
¥17,149.8
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PUR Non-Stocked Lead-Time 17 Weeks
¥18,114.9
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PUR Non-Stocked Lead-Time 15 Weeks
¥18,598.2
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PUR Non-Stocked Lead-Time 17 Weeks
¥23,971.6
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M PUR Non-Stocked Lead-Time 17 Weeks
¥26,376.7
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M RAIL Non-Stocked Lead-Time 17 Weeks
¥17,636.5
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M RAIL Non-Stocked Lead-Time 17 Weeks
¥19,579.9
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M RAIL Non-Stocked Lead-Time 17 Weeks
¥25,112.7
¥20,544.9
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M RAIL Non-Stocked Lead-Time 17 Weeks
¥31,228.5
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL ST/ST M/M RAIL Non-Stocked Lead-Time 15 Weeks
¥53,221.8
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL AN/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥20,245.9
Min.: 10
Mult.: 1
HARTING Sensor Cables / Actuator Cables M12 X-COD 8-POL AN/- M/- RAIL Non-Stocked Lead-Time 17 Weeks
¥15,163.3
Min.: 10
Mult.: 1