Snap Lock Supports

Essentra Components Snap Lock Supports are designed to space printed circuit boards (PCBs) to an exact height and are easily installed by hand. These components assist with the support, spacing, locking, and guiding of the PCB within electronic applications. These supports eliminate the need for screws and nuts while providing electrical insulation. Essentra Snap Lock Supports are available in numerous diameters and panel sizes. The supports can be installed manually and do not require automated assembly equipment.

Results: 1,485
Select Image Part # Mfr. Description Datasheet Availability Pricing (JPY) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Product Type Thread Size Length Material Outside Diameter Gender
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,3/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,1/4 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,5/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,5/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,3/8 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,3/8 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,7/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Supports Push Spacer 11.1 mm Nylon 3.9 mm
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,7/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,1/2 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,1/2 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,9/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Rst Mnt,Adh,Nat,9/16 in Spc Non-Stocked Lead-Time 11 Weeks
Min.: 1,000
Mult.: 1,000

Supports
Essentra Standoffs & Spacers CB Spt,W/Cushion,Natural,1/2 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports Push Spacer, Cushion 12.7 mm Nylon 10 mm Male
Essentra Standoffs & Spacers CB Spt,W/Cushion,Natural,5/8 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports Push Spacer, Cushion 15.9 mm Nylon 10 mm Male
Essentra Standoffs & Spacers CB Spt,W/Cushion,Natural,3/4 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports Push Spacer, Cushion 19.1 mm Nylon 10 mm Male
Essentra Standoffs & Spacers CB Spt,Mini,Rest Mnt,Nat,1/8 in Spc Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports PCB Support 1/8 in Nylon 11/64 in
Essentra Standoffs & Spacers CB Spt,Mini,Rest Mnt,Nat,9/16 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Rest Mnt,Natural,5/8 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports Push Spacer, Teardrop 15.9 mm Nylon 4.4 mm Male
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,5/8 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,5/16 inSpc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,5/16 inSpc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,7/16 inSpc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,1/2 in Spc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,9/16 inSpc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports
Essentra Standoffs & Spacers CB Spt,Reverse Mnt,Natural,5/16 inSpc Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1

Supports