Thermal Management

Results: 69
Select Image Part # Mfr. Description Datasheet Availability Pricing (JPY) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Sanyo Denki DC Fans DC Axial Fan, 40x40x28mm, 24VDC, Groove for Lead 132In Stock
126Expected 11/23/2026
Min.: 1
Mult.: 1

Bergquist Company TSP1600-0.005-00-138
Bergquist Company Thermal Interface Products High Performance Insulator for Low-Pressure Apps, Sil-Pad TSP 1600 / 800 Non-Stocked Lead-Time 16 Weeks
Min.: 1,023
Mult.: 1

Wakefield Thermal Liquid Cold Plates, Liquid Cooling & Heat Pipes Heat Pipe, Flattened, Sintered, Copper, Water, 4.2x10.17x250mm Non-Stocked Lead-Time 16 Weeks
Min.: 100
Mult.: 100

Aavid Heat Sinks Stanchion Pads, 2.54x20.32x8mm Non-Stocked Lead-Time 13 Weeks
Min.: 10,000
Mult.: 1,000

Aavid Thermal Interface Products Insulating Covers for TO-3, White, Nylon, Self-Extinguishing UL 94 V-2 Non-Stocked Lead-Time 15 Weeks
Min.: 1,000
Mult.: 1,000

Aavid Heat Sinks Stanchion Pads, 1.27x19.05x8mm Non-Stocked Lead-Time 13 Weeks
Min.: 5,000
Mult.: 500


3M Electronic Specialty Thermal Interface Products Thermally Conductive Silicone Interface Pad 98In Stock
Min.: 1
Mult.: 1
3M Electronic Specialty Thermal Interface Products Interfac Pad Sheet 210mm x 300mm x1.0mm 162In Stock
Min.: 1
Mult.: 1

3M Electronic Specialty Thermal Interface Products 3M Thermally Conductive Silicone Interface Pad 5583S is a highly conformable, slightly tacky silicone elastomer pad. Designed to provide heat transfer path between heat generating components and heat sinks, heat spreaders or other cooling devices. 162In Stock
200Expected 10/14/2026
Min.: 1
Mult.: 1
3M Electronic Specialty Thermal Interface Products Silicon Intrfac Pad 210mm x 155mm x1.0mm 51In Stock
Min.: 1
Mult.: 1
White-Rodgers W 48HH
White-Rodgers Heat Exchangers BURNOUT CLEAN UP FILTER DRIER CORE FOR ADKS, STAS SHELLS AND SIMILAR COMPETITIVE SHELLS NOT FOR BTAS, REFRIGERANT RECOMMENDED CFC, HCFC, HFC, SIZE 48 CU. IN., BURNOUT CLEANUP, WATER CAPACITY R-404A/R-507, 417 DROPS AT 75 F, 289 DROPS AT 125 F Non-Stocked
Min.: 1
Mult.: 1
Sunon Blowers & Centrifugal Fans Blower, 97x95x33mm, 12VDC, 54.7CFM, 5.22"H2O, Ball, Wire, Auto Restart
25Expected 10/13/2026
Min.: 1
Mult.: 1

TE Connectivity / Measurement Specialties NTC Thermistors PRECISION GLASS NTC THERMISTOR Non-Stocked Lead-Time 52 Weeks
Min.: 1
Mult.: 1
TE Connectivity / Measurement Specialties NTC Thermistors PRECISION GLASS NTC THERMISTOR Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1
Sanyo Denki DC Fans DC Axial Fan, 60x60x38mm, 12VDC, Guide Vane, Locked Rotor Sensor Non-Stocked Lead-Time 27 Weeks
Min.: 90
Mult.: 90

3M Electronic Specialty Thermal Interface Products WX300950721 3M(TM) THERMALLY COND INTERFACE PAD 5549S, 210MM X 155MM 0.5MM Non-Stocked
Min.: 400
Mult.: 80
Aavid DC Fans Axial, 50x50x25mm, 12VDC, 22.1CFM, 0.4A, 39dBA, 6500RPM, 0.26"H2O, Lock Sensor Non-Stocked Lead-Time 8 Weeks
Min.: 2,000
Mult.: 1,000

Sunon DC Fans Axial Fan, 92x92x25mm, 12VDC, 65CFM, 0.25"H2O, Ball, Wire, Auto Restart, IP56 Non-Stocked Lead-Time 28 Weeks
Min.: 1
Mult.: 1

3M Electronic Specialty Thermal Interface Products Silicon Intrfac Pad 210mm x 155mm x2.0mm Non-Stocked
Min.: 200
Mult.: 20
Sunon PF97331BX-B00U-Q99
Sunon Blowers & Centrifugal Fans DC Blower, 97x97x33mm, 12VDC, Ball Bearing, 4x Wire, PWM, Locked Rotor Sensor Non-Stocked Lead-Time 28 Weeks
Min.: 30
Mult.: 1

Aavid B-510-200-40G
Aavid Thermal Interface Products Heat Sink Washer Non-Stocked Lead-Time 22 Weeks
Min.: 100
Mult.: 100

Sunon MF20080V1-1000U-S99
Sunon DC Fans DC Axial Fan, 20x20x8mm, 5VDC, Vapo, 4x Wire, Auto Restart/Tach/PWM, MagLev Non-Stocked Lead-Time 28 Weeks
Min.: 1
Mult.: 1

3M Electronic Specialty Thermal Interface Products WX300950747 3M(TM) THERMALLY COND INTERFACE PAD 5549S, 210MM X 155MM 1.5MM Non-Stocked
Min.: 200
Mult.: 20

3M Electronic Specialty Thermal Interface Products Silicon Intrfac Pad 210mm x 300mm x2.5mm Non-Stocked
Min.: 150
Mult.: 10
Sunon PF97331BX-B00U-F99
Sunon Blowers & Centrifugal Fans DC Blower, 97x97x33mm, 12VDC, Ball, 3x Wire, Auto Restart, Locked Rotor Sensor Non-Stocked Lead-Time 28 Weeks
Min.: 30
Mult.: 1